509-906-1250 start@wacolo.com
← Business Internet by Crescent Bar Internet
AI & GPU Compute Crypto Mining Colocation Campuses Storage Contact
// AI & GPU Compute — Grant County, WA

Run Your AI Workloads
on Cheap Hydro Power.

Grant County PUD hydroelectric power is some of the cheapest commercial electricity in the United States. It's why Microsoft, Amazon, and Google built in Quincy. It's why your GPU clusters and AI inference workloads belong here — colocated with a local ISP that gives you a direct line to the people who run the network.

⚡ Cheap hydro power 🤖 GPU cluster ready 🌐 ISP-native fiber 📍 5 campuses 🤝 Owner-operated
$225/kW starting
Per kW/mo — all-in
112kW
Mattawa East — Sept 2026
2MW+
Columbia Basin — 2027+
<1ms
Cross-campus latency
50
Mbps/kW included — no per-GB fees

Power Is Your Biggest
Operating Cost.

A single 8-GPU server draws 3–6kW. A growing multi-server cluster can pull 25–50kW or more. At those power densities, where you plug in matters more than almost anything else.

// The math on 50kW of GPU compute

$9,000–$9,500
Per month here
$180–$190/kW at 50kW
$25,000+
Per month in Seattle
Typical $500+/kW
$150K+
Annual savings
On 50kW of compute
Estimates based on typical Pacific Northwest colocation market rates. Actual savings depend on your specific power draw and configuration. Contact us for a custom quote. Our rate scales with commitment size — smaller deployments (up to 5kW) are priced starting at $225/kW; larger commitments (15kW+) run $180–$190/kW. Power, space, and connectivity included.
💧

Columbia River Hydro

Grant County PUD delivers Columbia River hydroelectric power at rates consistently ranked among the lowest commercial electricity costs in the US. The same reason the hyperscalers built here — and we're passing that advantage directly to you.

🔌

High-Density Power Circuits

208V, 3-phase power available at Mattawa and Columbia Basin campuses for high-density GPU workloads. We configure circuits around your hardware — not the other way around. Custom amperage and phase configurations available; contact us with your specs.

📞

Owner-Operated Flexibility

You're not working through a procurement process and a sales team. Call the owner directly at 509-906-1250. Custom power configurations, non-standard circuits, or unusual hardware — if it's feasible, we'll work it out with you directly.

What Runs Well on Cheap Power

Any GPU-dense, power-hungry AI workload benefits from cheap hydro power. Here's what our customers are running or planning to run.

🧠

AI Inference Clusters

Running LLM inference 24/7? Power cost dominates your TCO. Colocate your inference hardware in Grant County and your per-token cost drops dramatically versus Seattle, Portland, or California facilities. Single GPU server or a multi-server rack — we work with you on the right footprint.

🔬

Model Training & Fine-Tuning

Training runs that go for days or weeks are exactly where cheap power matters most. Colocate your training hardware — GPU clusters, storage arrays, and interconnects — in a facility that doesn't penalize you for running at full power draw around the clock.

💾

AI-Adjacent Storage

Pair your GPU compute with our S3-compatible object storage on the same local network. Your training data and model checkpoints live next to your compute — sub-millisecond access, simple flat pricing, no cloud storage bills eating into your budget.

🏗️

Distributed & Redundant Deployments

Need your AI workloads distributed for resilience? Split your cluster across two campuses — sub-millisecond cross-campus VLAN connectivity means your nodes can communicate as if they're on the same rack, while getting power diversity across different grid feeds.

Straightforward kW Pricing. No Hidden Fees.

Power, space, and connectivity — all in. Real bandwidth included, not nickel-and-dimed by the gigabyte: 50 Mbps per kW reserved, billed on 95th-percentile usage (not per-GB), with overage at $2/Mbps — a fraction of typical cloud egress pricing.

Starter
Up to 5kW
$225/kW/mo
~$1,125/mo at 5kW all-in
  • Up to 5kW power draw
  • Available at any live campus (Island, Trinidad, Mattawa West)
  • 30A/208V circuit standard
  • Grant County PUD fiber — 50Mbps/kW included
  • Static IPs included
  • VLAN isolation
  • Month-to-month
Get a Quote →
Pricing is starting point — contact for exact quote
Large Scale
25kW–100kW+
Custom
Contact us for pricing
  • 25kW+ capacity
  • High-amperage 3-phase circuits
  • Generator backup available (Mattawa)
  • Multi-campus deployment option
  • Custom term and configuration
  • Anchor tenant input on facility design
  • Volume pricing — better rates at scale
Contact for Pricing →
Talk directly to the owner

Every AI deployment is different. Tell us your GPU count, power draw estimate, and timeline — we'll give you a real number, not a quote that requires three more calls to finalize.

Get a Custom Quote →

Calculate Your Hosting Cost

See how much you'll pay to colocate GPUs at Columbia vs. cloud pricing. All-in power cost, no surprise bandwidth charges.

Your Deployment

Columbia Cost

Power Draw 0 kW
Monthly Cost $0

Mattawa East Phase 1 Opens September 2026.

Mattawa West is live now with 5kW available for smaller AI/GPU deployments. Mattawa East — a half mile away on the same fiber backbone — brings 112kW of power-dense capacity online in Phase 1 this September, with high-density power circuits and full facility generator backup. The Columbia Basin campus is a future concept for larger-scale operations, with no fixed timeline yet.

Phase 1 — September 2026
Mattawa East Campus
112kW capacity in Phase 1. High-density power circuits. Full facility generator backup. Grant County PUD fiber. Taking anchor tenant reservations now.
Reserve Capacity →
Future Concept
Columbia Basin Campus
2MW+ planned. Full generator backup. Designed for large AI and mining scale. Timeline driven by anchor tenant commitment — no fixed date yet. Expressions of interest open now.
Express Interest →
View all five campuses and current availability →

Tell Us About Your AI Workload.

We want the details.

GPU count, power draw estimate, interconnect requirements, timeline, redundancy needs — the more you tell us, the faster we can give you a real number. No sales scripts, no runaround.

Mattawa East Phase 1 (112kW) is taking anchor tenant reservations now for its September 2026 opening. Columbia Basin campus is accepting expressions of interest as a future concept.

✓ Got it — we'll be in touch shortly!

Related pages

GPU Colocation Washington → | Colocation Pricing Guide → | Seattle Colocation Alternative →
Operated by Crescent Bar Internet, LLC — Veteran-owned ISP on Grant County PUD fiber, Central Washington.