Grant County PUD hydroelectric power is some of the cheapest commercial electricity in the United States. It's why Microsoft, Amazon, and Google built in Quincy. It's why your GPU clusters and AI inference workloads belong here — colocated with a local ISP that gives you a direct line to the people who run the network.
A single 8-GPU server draws 3–6kW. A growing multi-server cluster can pull 25–50kW or more. At those power densities, where you plug in matters more than almost anything else.
Grant County PUD delivers Columbia River hydroelectric power at rates consistently ranked among the lowest commercial electricity costs in the US. The same reason the hyperscalers built here — and we're passing that advantage directly to you.
208V, 3-phase power available at Mattawa and Columbia Basin campuses for high-density GPU workloads. We configure circuits around your hardware — not the other way around. Custom amperage and phase configurations available; contact us with your specs.
You're not working through a procurement process and a sales team. Call the owner directly at 509-906-1250. Custom power configurations, non-standard circuits, or unusual hardware — if it's feasible, we'll work it out with you directly.
Any GPU-dense, power-hungry AI workload benefits from cheap hydro power. Here's what our customers are running or planning to run.
Running LLM inference 24/7? Power cost dominates your TCO. Colocate your inference hardware in Grant County and your per-token cost drops dramatically versus Seattle, Portland, or California facilities. Single GPU server or a multi-server rack — we work with you on the right footprint.
Training runs that go for days or weeks are exactly where cheap power matters most. Colocate your training hardware — GPU clusters, storage arrays, and interconnects — in a facility that doesn't penalize you for running at full power draw around the clock.
Pair your GPU compute with our S3-compatible object storage on the same local network. Your training data and model checkpoints live next to your compute — sub-millisecond access, simple flat pricing, no cloud storage bills eating into your budget.
Need your AI workloads distributed for resilience? Split your cluster across two campuses — sub-millisecond cross-campus VLAN connectivity means your nodes can communicate as if they're on the same rack, while getting power diversity across different grid feeds.
Power, space, and connectivity — all in. Real bandwidth included, not nickel-and-dimed by the gigabyte: 50 Mbps per kW reserved, billed on 95th-percentile usage (not per-GB), with overage at $2/Mbps — a fraction of typical cloud egress pricing.
Every AI deployment is different. Tell us your GPU count, power draw estimate, and timeline — we'll give you a real number, not a quote that requires three more calls to finalize.
Get a Custom Quote →See how much you'll pay to colocate GPUs at Columbia vs. cloud pricing. All-in power cost, no surprise bandwidth charges.
Mattawa West is live now with 5kW available for smaller AI/GPU deployments. Mattawa East — a half mile away on the same fiber backbone — brings 112kW of power-dense capacity online in Phase 1 this September, with high-density power circuits and full facility generator backup. The Columbia Basin campus is a future concept for larger-scale operations, with no fixed timeline yet.
GPU count, power draw estimate, interconnect requirements, timeline, redundancy needs — the more you tell us, the faster we can give you a real number. No sales scripts, no runaround.
Mattawa East Phase 1 (112kW) is taking anchor tenant reservations now for its September 2026 opening. Columbia Basin campus is accepting expressions of interest as a future concept.