509-906-1250 start@wacolo.com
← Business Internet by Crescent Bar Internet
AI & GPU Colocation Colocation Pricing Campuses Contact
// AI & GPU Colocation — Grant County, WA

Colocate Your AI Servers
on Cheap Hydro Power.

Bring your own GPU servers. We provide up to 17.3kW per rack on 208V 3-phase power, air-cooled hot/cold aisle cooling, and 50 Mbps of bandwidth per kW (about 16 TB/month) — on Grant County PUD hydro power at roughly 4.6¢/kWh, among the cheapest commercial electricity in the United States. Owner-operated, with a direct line to the people who run the network. We do not rent servers or GPUs.

⚡ Cheap hydro power 🔌 17.3kW racks · 208V 3-phase ❄️ Air-cooled hot/cold aisle 📍 5 campuses 🤝 Owner-operated
$200/kW
Per kW/mo — all-in
2MW
Mattawa East — open, contact us
2.5MW
Shells for dedicated builds
<1ms
Cross-campus latency
50
Mbps/kW included — no per-GB fees

What You Can Plan Around. Up to 17.3kW Per Rack.

Customer-owned servers only. These are the numbers GPU buyers ask for first.

// Facility specs

Power per rackUp to 17.3kW — 208V 3-phase, 60A circuit, 48A continuous
Single-phase30A single-phase PDUs available
PDUsAPC and Raritan
CoolingAir-cooled, hot/cold aisle. Liquid cooling not offered today; being evaluated.
Bandwidth50 Mbps per kW included (about 16 TB/month per kW) on a 1 Gbps connection
NetworkGrant County PUD fiber, static IPs, VLAN isolation, cross-campus L2
PricingFrom $200/kW/mo all-in. $0 setup.

// What typically fits in one rack

1 × 8-GPU nodeH100/H200-class, about 10kW each, plus networking and storage
1 × 8-GPU nodeB200-class, about 14kW — fits within a single 17.3kW rack
2–3 × 4-GPU serversAbout 5–6kW each
4–8 × GPU workstationsRTX-class servers at roughly 1.5–3kW each
Typical figures only — check your server's maximum draw. Deployments above 17.3kW use multiple racks or a custom circuit.

Power Is Your Biggest
Operating Cost.

A single 8-GPU server draws 3–6kW. A growing multi-server cluster can pull 25–50kW or more. At those power densities, where you plug in matters more than almost anything else.

// The math on 50kW of GPU compute

$10,000
Per month here
$200/kW at 50kW
$25,000+
Per month in Seattle
Typical $500+/kW
$150K+
Annual savings
On 50kW of compute
Estimates based on typical Pacific Northwest colocation market rates. Actual savings depend on your specific power draw and configuration. Contact us for a custom quote. Pricing is $200/kW on a 12-month term ($210/kW month-to-month); a full rack reserved at 16kW is $3,000/mo on a 12-month commitment. Power, space, and connectivity included.
💧

Columbia River Hydro

Grant County PUD delivers Columbia River hydroelectric power at rates consistently ranked among the lowest commercial electricity costs in the US. The same reason the hyperscalers built here — and we're passing that advantage directly to you.

🔌

High-Density Power Circuits

208V, 3-phase power available at Mattawa campuses for high-density GPU workloads. We configure circuits around your hardware — not the other way around. Custom amperage and phase configurations available; contact us with your specs.

📞

Owner-Operated Flexibility

You're not working through a procurement process and a sales team. Call the owner directly at 509-906-1250. Custom power configurations, non-standard circuits, or unusual hardware — if it's feasible, we'll work it out with you directly.

What Runs Well on Cheap Power

Any GPU-dense, power-hungry AI workload benefits from cheap hydro power. Here's what our customers are running or planning to run.

🧠

AI Inference Clusters

Running LLM inference 24/7? Power cost dominates your TCO. Colocate your inference hardware in Grant County and your per-token cost drops dramatically versus Seattle, Portland, or California facilities. Single GPU server or a multi-server rack — we work with you on the right footprint.

🔬

Model Training & Fine-Tuning

Training runs that go for days or weeks are exactly where cheap power matters most. Colocate your training hardware — GPU clusters, storage arrays, and interconnects — in a facility that doesn't penalize you for running at full power draw around the clock.

💾

AI-Adjacent Storage

Pair your GPU compute with our S3-compatible object storage on the same local network. Your training data and model checkpoints live next to your compute — sub-millisecond access, simple flat pricing, no cloud storage bills eating into your budget.

🏗️

Distributed & Redundant Deployments

Need your AI workloads distributed for resilience? Split your cluster across two campuses — sub-millisecond cross-campus VLAN connectivity means your nodes can communicate as if they're on the same rack, while getting power diversity across different grid feeds.

Straightforward kW Pricing. No Hidden Fees.

Power, space, and connectivity — all in. Real bandwidth included, not nickel-and-dimed by the gigabyte: 50 Mbps per kW included (about 16 TB/month per kW) on a 1 Gbps connection, with no per-GB fees.

Starter
Up to 5kW
$200/kW/mo
~$1,000/mo at 5kW, 12-month term
  • Up to 5kW power draw
  • Available at any live campus (Island, Trinidad, Mattawa West)
  • 30A/208V circuit standard
  • Grant County PUD fiber — 50Mbps/kW included
  • Static IPs included
  • VLAN isolation
  • 12-month term (month-to-month +$10/kW)
Get a Quote →
Pricing is starting point — contact for exact quote
Large Scale
25kW–100kW+
Custom
Contact us for pricing
  • 25kW+ capacity
  • High-amperage 3-phase circuits
  • UPS and generator backup planned at Mattawa East (first half 2027)
  • Multi-campus deployment option
  • Custom term and configuration
  • 4–8 racks or a custom room, up to 300–400kW, with a longer-term commitment
  • Quoted individually at scale
Contact for Pricing →
Talk directly to the owner

Every AI deployment is different. Tell us your GPU count, power draw estimate, and timeline — we'll give you a real number, not a quote that requires three more calls to finalize.

Get a Custom Quote →

Calculate Your Hosting Cost

See how much you'll pay to colocate GPUs at Columbia vs. cloud pricing. All-in power cost, no surprise bandwidth charges.

Your Deployment

Columbia Cost

Power Draw 0 kW
Monthly Cost $0

Mattawa East Is Open.

Mattawa West is live now with 5kW available for smaller AI/GPU deployments. Mattawa East — a half mile away on the same fiber backbone — is open with 2MW of capacity and high-density power circuits. Contact us for details. Dedicated builds: for larger-scale operations, with no fixed timeline yet.

Open now · 2MW
Mattawa East Campus
2MW of capacity, open now. High-density power circuits. Grant County PUD fiber. Contact us for details.
Reserve Capacity →
Contact us
Dedicated Builds
We can build a private 4–8 rack suite within our Mattawa facility for customers who need their own space for security or compliance reasons. For a fully dedicated site, we have a 2MW shell in Ellensburg and a 2.5MW shell in Moses Lake. Build-out is financed against a serious commitment. Contact us.
Contact Us →
View all campuses and current availability →

GPU Colocation FAQ

Can I colocate H100, H200 or B200 servers?

Yes, if you own the hardware and it fits our rack power and cooling envelope. Racks deliver up to 17.3kW on 208V 3-phase power, air-cooled in a hot/cold aisle layout. An 8-GPU H100/H200-class node typically draws about 10kW, so a rack usually holds one such node plus networking and storage. Check your server's maximum draw and airflow requirements; direct liquid-cooled platforms are not supported today.

How much does GPU colocation cost per kW?

GPU and AI colocation starts at $200 per kW per month all-in (power, cooling, space and bandwidth). Pricing is based on a 12-month term; month-to-month is $210 per kW. A 10kW deployment is $2,000 per month, and a full rack reserved at 16kW is $3,000 per month on a 12-month commitment. There is no setup fee.

Do you provide GPUs or servers?

No. Columbia Colocation does not rent servers or GPUs. You bring your own hardware and we provide space, power, cooling and network.

What power and PDUs do you use?

Racks are fed by 208V 3-phase 60A circuits (48A continuous, about 17.3kW) using APC and Raritan PDUs. 30A single-phase PDUs are available for smaller or older equipment.

Do you offer liquid cooling?

Not today. Racks are air-cooled in a hot/cold aisle layout. We are evaluating liquid cooling for future deployments, so tell us your requirements.

How much bandwidth is included?

Your connection is 1 Gbps. Each kW includes 50 Mbps of sustained bandwidth, about 16 TB/month if used continuously, with no per-GB fees. Usage is measured at the 95th percentile. Overage is $2 per Mbps. Fiber is Grant County PUD with static public IPs and VLAN isolation.

Why colocate AI hardware in Grant County, Washington?

Grant County PUD supplies Columbia River hydroelectric power at roughly 4.6 cents per kWh, among the lowest commercial rates in the United States. For GPU servers that run around the clock, power is the largest operating cost.

Tell Us About Your AI Workload.

We want the details.

GPU count, power draw estimate, interconnect requirements, timeline, redundancy needs — the more you tell us, the faster we can give you a real number. No sales scripts, no runaround.

Mattawa East (2MW, open) is taking customers now. Multi-rack and custom-room builds (4–8 racks, up to 300–400kW) are possible with a longer-term commitment. For a dedicated location, we have 2MW and 2.5MW shells available; contact us.

✓ Got it — we'll be in touch shortly!

Related pages

GPU Colocation Washington → | Colocation Pricing Guide → | Seattle Colocation Alternative →
Operated by Crescent Bar Internet, LLC — Veteran-owned ISP on Grant County PUD fiber, Central Washington.