509-906-1250 start@wacolo.com
← Business Internet by Crescent Bar Internet
AI & GPU Colocation Colocation Pricing Campuses Contact
// GPU Colocation — Washington State

GPU Colocation in
Washington on Cheap Hydro Power.

Own your GPU servers. Colocate them in Grant County, WA — where Columbia River hydro power from Grant County PUD makes electricity costs 40–60% lower than Seattle. Same 10–20ms latency. Real bandwidth included, not nickel-and-dimed by the gigabyte. Racks deliver up to 17.3kW on 208V 3-phase power, air-cooled. Owner-operated facility with real people on the phone.

🔌 Up to 17.3kW per rack ⚡ From $200/kW 🌐 10–20ms to Seattle ⚡ Real bandwidth included ✅ First GPU customer live 🤝 Owner-operated
$200
Per kW/mo — 12-month term
10–20ms
Latency to Seattle
50
Mbps/kW included
5kW
First GPU customer live
5
Campuses in Grant County

Our First GPU Colocation
Customer Is Live.

GPU colocation in Washington state isn't hypothetical for us. We have a paying customer running dedicated GPU hardware right now.

// Case Study — First GPU Deployment

5kW Dedicated GPU Deployment
on a 24-Month Term

Our first GPU colocation customer colocates a dedicated GPU server cluster at our Quincy facility on a 5kW dedicated power circuit, 24-month term. The deployment runs continuously on Columbia River hydro power with 50 Mbps of included bandwidth per kW — 250 Mbps (about 80 TB/month) at this customer's 5kW, with no per-GB fees.

This customer evaluated Seattle-area colocation options before choosing Quincy. The decision came down to power cost and flexibility: the same 5kW deployment in a Seattle facility would cost roughly 2–2.5× more per month. Grant County PUD hydro power changes the economics of running GPU hardware around the clock.

5kW
Dedicated power
24mo
Term commitment
~2×
Cheaper vs Seattle
250
Mbps included

Power Cost Is the
Biggest Variable.

A single 8-GPU server draws 3–6kW continuously. At that power density, where you plug in matters more than almost any other infrastructure decision.

// Monthly cost comparison — 5kW GPU deployment

$1,000
Columbia Colocation, Grant County WA
$200/kW all-in
$2,000–$3,000+
Typical Seattle-area facility
$400–$600/kW typical
$10,500–$23,000+
Annual savings on 5kW
Real savings, confirmed by our first customer
Seattle-area facility rates are estimates based on publicly available market data. Actual savings depend on your power draw, configuration, and term. Contact us for an exact comparison based on your hardware specs.
💧

Columbia River Hydro Power

Grant County PUD delivers Columbia River hydroelectric power — consistently among the cheapest commercial electricity rates in the US. Microsoft, Amazon, and Google all built in Quincy for the same reason. You get the same power advantage at a fraction of hyperscaler scale.

🌐

Seattle-Adjacent Connectivity

10–20ms latency from Quincy to Seattle on Grant County PUD fiber. Sufficient for AI inference serving, model APIs, and remote management. Connections are 1 Gbps, and each kW includes 50 Mbps of sustained bandwidth (about 16 TB/month per kW) — never billed by the gigabyte.

📞

Owner-Operated Flexibility

Call the owner at 509-906-1250. Unusual power configurations, non-standard circuits, custom cooling requirements — we work these out directly, not through a ticket queue. If it's physically feasible, we'll figure it out with you.

What Our GPU Colocation
Customers Run

🤖

AI Inference Servers

Running LLM inference, image generation, or ML model APIs 24/7? Power cost at full utilization dominates your TCO. Colocate your inference hardware in Grant County and your per-request cost drops dramatically versus Seattle or cloud GPU instances. 12-month term, or month-to-month at $210/kW.

🔬

Model Training Hardware

Training runs that go days or weeks hit full power draw the entire time. That's exactly when cheap power matters most. Colocate your training cluster — GPU servers, NVMe storage, and InfiniBand interconnects — in a facility that doesn't penalize you for running hot and heavy around the clock.

🎮

GPU Render Farms

Visual effects, 3D rendering, and compute rendering workloads are power-hungry and latency-tolerant. Grant County is ideal: cheap power, fast fiber to Seattle, real bandwidth included for your render output. Custom rack configurations for high-density GPU arrays available.

🔬

Research & Simulation Clusters

University labs, research groups, and simulation workloads that run for days at full draw. Grant County PUD hydro power keeps long-running GPU jobs affordable. Bring your own cluster and we handle power, cooling, and bandwidth.

GPU Colocation in Quincy vs
Seattle-Area Facilities

For GPU workloads specifically, the comparison isn't close. Here's what to expect:

Factor Columbia Colocation (Quincy, WA) Typical Seattle-Area Colo
Power rate (5kW GPU) $200/kW/mo all-in $400–600+/kW/mo typical
Monthly cost (5kW example) ~$1,000/mo ~$2,000–$3,000+/mo
Bandwidth 50Mbps/kW incl., no per-GB fees $0.05–$0.10+/GB common
Latency to Seattle 10–20ms <5ms
3-phase power for GPU Available (208V 3-phase) Available at most facilities
Custom circuit configs Yes — call the owner directly Yes, but through procurement
Minimum term 12-month term; month-to-month +$10/kW Often 12-month minimum
Who answers the phone The owner Sales / support team

Seattle-area facility rates are estimates based on publicly available information. Actual rates vary by facility and configuration.

Built for GPU Servers. Up to 17.3kW Per Rack.

Customer-owned servers only — we do not rent servers or GPUs.

// Facility specs

Power per rackUp to 17.3kW — 208V 3-phase, 60A circuit, 48A continuous
Single-phase30A single-phase PDUs available
PDUsAPC and Raritan
CoolingAir-cooled, hot/cold aisle. Liquid cooling not offered today; being evaluated.
Bandwidth1 Gbps connection; 50 Mbps per kW included (about 16 TB/month per kW), no per-GB fees
PricingFrom $200/kW/mo all-in. $0 setup.

// What typically fits in one rack

1 × 8-GPU nodeH100/H200-class, about 10kW each, plus networking and storage
1 × 8-GPU nodeB200-class, about 14kW — fits within a single rack
2–3 × 4-GPU serversAbout 5–6kW each
4–8 × GPU workstationsRTX-class at roughly 1.5–3kW each
Typical figures only — check your server's maximum draw. Above 17.3kW we use multiple racks or a custom circuit.

Straightforward kW Pricing.
Power, Space & Fiber Included.

No hidden line items. One rate covers power, rack space, and 50 Mbps of bandwidth per kW reserved — billed on actual usage, not per gigabyte.

Single Server / Starter
Up to 5kW
$200/kW/mo
~$1,000/mo at 5kW, 12-month term
  • Up to 5kW dedicated power
  • Available at any live campus (Island, Trinidad, Mattawa West)
  • 208V single-phase circuit standard
  • 50Mbps/kW bandwidth included (up to 250Mbps)
  • Static IPs included
  • VLAN isolation
  • 12-month term (month-to-month +$10/kW)
  • Remote hands available
Get a Quote →
Starting point — contact for exact quote
Large Scale
25kW–100kW+
Custom
Contact us for pricing
  • 25kW+ capacity
  • High-amperage 3-phase circuits
  • UPS and generator backup planned at Mattawa East (first half 2027)
  • Multi-campus deployment option
  • Custom term and configuration
  • 4–8 racks or a custom room, up to 300–400kW, with a longer-term commitment
  • Quoted individually at scale
Contact for Pricing →
Talk directly to the owner

GPU deployments vary widely. Tell us your GPU models, server count, estimated power draw, and timeline — we'll give you a real number fast.

Get a Custom GPU Quote →

Common Questions About
GPU Colocation in Washington

Racks are built for up to 17.3kW each on 208V 3-phase power (60A circuit, 48A continuous), using APC and Raritan PDUs; 30A single-phase is also available. An 8-GPU H100/H200-class node typically draws about 10kW, so a rack usually holds one such node plus networking, or several smaller GPU servers.
Air-cooled in a hot/cold aisle layout. Liquid cooling is not offered today; we are evaluating it for future deployments, so tell us if your hardware requires it.
No. You bring and own the hardware; we provide space, power, cooling and bandwidth.
GPU colocation means housing your own GPU servers in a data center facility — you own the hardware, the facility provides power, cooling, rack space, and fiber connectivity. Washington state, specifically Grant County, is one of the most cost-effective locations in the US for GPU colocation due to Columbia River hydro power from Grant County PUD. You get low-cost electricity for power-hungry GPU workloads, with Seattle-adjacent latency and connectivity.
Power cost. Grant County PUD hydroelectric power typically runs 40–60% lower than commercial power rates in Seattle. For GPU servers drawing 3–10kW each and running 24/7, this translates to $1,000–$2,000+ in monthly savings per server versus a Seattle facility. Latency from Quincy to Seattle is 10–20ms — sufficient for AI inference APIs, model serving, and remote management. You get Seattle-adjacent connectivity at Central Washington power economics.
At Columbia Colocation, GPU colocation pricing is $200/kW/month all-in on a 12-month term ($210/kW month-to-month). That's roughly $1,000/month for a 5kW single high-draw GPU server, and $3,000/month for a full rack reserved at 16kW. Starter deployments can go at any of our live campuses (Island, Trinidad, or Mattawa West) based on current availability. All pricing includes power, rack space, and 50 Mbps of bandwidth per kW (about 16 TB/month per kW) on a 1 Gbps connection, billed by the 95th percentile rather than per gigabyte — no surprise charges. Overage beyond your included allowance is $2/Mbps. Contact us with your GPU specs for an exact quote.
Any GPU server hardware — NVIDIA H100, A100, RTX 4090 / 3090 builds, AMD Instinct MI300, custom inference or training rigs. We configure 208V single-phase and 3-phase circuits around your specific hardware requirements. Reach out with your GPU model, server count, and estimated power draw (watts) and we'll spec the right circuit configuration for your deployment.
No hard minimum. We accommodate single GPU server deployments from around 1–3kW. Pricing is $200/kW on a 12-month term, or $210/kW month-to-month. Our first GPU colocation customer chose a 24-month term at 5kW dedicated power — that's the kind of deal where both parties benefit from the commitment.
For most GPU workloads, 10–20ms to Seattle is a non-issue. AI inference APIs, model serving, training jobs, and render farms all operate fine at that latency. If your application requires sub-5ms response times to Seattle end users, a Seattle-area facility may be more appropriate — but most customers find that Grant County power savings far outweigh the latency trade-off. Talk to us about your specific latency requirements.
🤖 AI & GPU Colocation → 📊 Colocation Pricing Guide → 🏙️ Seattle Colocation Alternative → 📍 Our Campuses →

Tell Us About Your GPU Hardware.

We want the specs.

GPU model, server count, estimated power draw, cooling requirements, timeline — the more you tell us, the faster we can give you a real number. No sales scripts, no runaround. You're talking to the people who run the facility.

Our first GPU colocation customer went from inquiry to signed agreement in under a week. That's how we operate.

✓ Got it — we'll be in touch shortly!
Operated by Crescent Bar Internet, LLC — Veteran-owned ISP on Grant County PUD fiber, Central Washington.