509-906-1250 start@wacolo.com
← Business Internet by Crescent Bar Internet
AI & GPU Compute Crypto Mining Colocation Campuses Storage Contact
// Crypto Mining Hosting — Grant County, WA

Mine Where the
Power Is Cheap.

Power cost is your single biggest operating expense in crypto mining. Grant County PUD hydro power is why Microsoft, Amazon, and Google built their massive data centers in Quincy — and it's why your mining operation should be here too. Owner-operated, flexible terms, and real bandwidth included — not nickel-and-dimed by the gigabyte.

⚡ Cheap hydro power ⛏️ ASIC & GPU ready 🌐 ISP-native fiber 📍 5 campuses 🤝 Owner-operated
$225
Per kW/mo — starting
112kW
Mattawa East — Sept 2026
2MW+
Columbia Basin — 2027+
Real Bandwidth Included
5
Campuses — Grant County

Power Cost Is Everything
in Mining.

The difference between a profitable mining operation and a losing one often comes down to where you're plugged in. Grant County PUD hydro power delivers some of the lowest commercial rates in the United States — the same infrastructure that attracted the hyperscalers.

// The math on 50kW of mining hardware

$11,250
Per month here
$225/kW all-in
$25,000–
$40,000
Per month elsewhere
Typical US colo rates
$150K+
Annual savings
On 50kW of miners
Estimates based on typical US colocation market rates. Actual savings depend on your specific hardware and configuration. Contact us for a custom quote. We advertise starting at $225/kW — power, space, and connectivity all included.
💧

Columbia River Hydro Power

Grant County PUD delivers hydroelectric power at rates consistently among the lowest commercial electricity costs in the US. The same power grid used by Microsoft, Amazon, and Google's Columbia Basin campuses — available to your mining operation.

🔌

High-Density Power Circuits

ASICs and GPU rigs run hot and pull hard. 208V, 3-phase power available at Mattawa and Columbia Basin campuses. We configure circuits around your hardware — custom amperage configurations available. Contact us with your rig specs.

🌡️

Cooling That Keeps Up

Mining hardware generates significant heat. Our facilities are configured for high-density thermal loads — climate-controlled with cooling designed to handle the heat output of dense ASIC and GPU deployments. Mattawa is purpose-built infrastructure.

Spread Your Rigs. Protect Your Uptime.

Running 50 ASICs? Don't put them all on the same power feed. Distribute across two campuses and if a local outage hits one location, the other keeps running. All campuses are connected on Grant County PUD's fiber — cross-campus management stays simple.

Different Grid Feeds

Island, Trinidad, Mattawa West, Mattawa East, and Columbia Basin each draw from different substations and distribution runs on the PUD grid. A pole-down or substation issue at one campus doesn't affect another.

🌐

Sub-ms Cross-Campus Network

All campuses are on Grant County PUD's fiber backbone. Your pool connections and monitoring traffic stay on the same low-latency network regardless of which campus your rigs are at.

📋

One Operator, One Bill

Multi-campus mining operations don't mean multiple vendors. One contract, one contact, one monthly invoice — regardless of how many campuses you're spread across. We handle the logistics.

kW-Based Pricing. Everything Included.

Power, rack space, and connectivity — all in one number. No separate metered power charges, no surprise line items. Real bandwidth included, no per-gigabyte overage fees. You pay for power and space, not for data transfer.

Small Operation
Up to 10kW
$225/kW/mo
~$2,250/mo for 10kW all-in
  • Up to 10kW power draw
  • 30A/208V circuit standard
  • Grant County PUD fiber — real bandwidth included
  • Static IPs included
  • Month-to-month — no commitment
  • ASIC, GPU, or mixed hardware
Get a Quote →
Pricing is starting point — contact for exact quote
Large Operation
50kW–100kW+
Custom
Contact us for pricing
  • 50kW+ capacity
  • High-amperage 3-phase throughout
  • Generator backup available (Mattawa East)
  • Multi-campus deployment
  • Custom term and configuration
  • Volume pricing — better rates at scale
  • Columbia Basin campus 2MW+ — 2027+
Contact for Pricing →
Talk directly to the owner

Mining hardware varies a lot. Give us your rig count, model, and estimated power draw — we'll come back with a real all-in number, not an estimate that changes three times.

Get a Custom Quote →

Mattawa West Is Live. Mattawa East Is Coming.

Mattawa West is open now with 10kW total capacity (5kW available). Mattawa East Phase 1 brings 112kW online in September 2026 — high-density 3-phase circuits and generator backup for select customers. The Columbia Basin campus (2MW+, 2027+) is where large-scale mining operations belong.

Available Now
Mattawa West Campus
10kW total capacity, 5kW available now. 208V 3-phase power. High-density cooling. Generator backup addon. Grant County PUD fiber. Taking reservations now.
Reserve Mining Space →
Targeting September 2026
Mattawa East Campus
Phase 1: 112kW available September 2026. High-density 3-phase circuits. Generator backup available. Grant County PUD fiber. Reach out now to reserve capacity.
Express Interest →
View all five campuses and current availability →

Mining-Specific Guides

ASIC Mining Guide →Bitcoin Mining →GPU Mining →Pricing →
>

Tell Us About Your Operation.

Give us the details.

Rig model, count, estimated power draw, and whether you want single-campus or multi-campus distribution — the more you tell us, the faster we can give you a real all-in number.

Mattawa West is taking reservations now. Mattawa East (Phase 1: 112kW, September 2026) and Columbia Basin campus are accepting expressions of interest for larger operations planning ahead.

✓ Got it — we'll be in touch shortly!
Operated by Crescent Bar Internet, LLC — Veteran-owned ISP on Grant County PUD fiber, Central Washington.